ATGGLOBAL MARKETS
RESEARCH
Latest research

Market observations retain their individual dates and statuses. This is dated research, not a live price feed.

Volatility / euro area · Avoid November versus December European volatility

November versus December European volatility

The 0.40-point midpoint premium becomes only 0.35 when crossed. Four same-contract comparisons narrowed by only 0.075 point on average. Even cheaper commission and spread assumptions leave a loss.

Research view only. New November 16 European morning comparison; no position.
EXACT EXPRESSIONBuy one November Eurex VSTOXX future and sell one December VSTOXX future.
DATED RESEARCH QUOTEFVSX26: 17.7 Volatility points · 2026-11-16T10:10:04Z; FVSZ26: 18.05 Volatility points · 2026-11-16T10:09:54Z

FVSX26 · intraday · November offer observed near 05:10 Toronto. The 05:10:04 timestamp is the latest nearby trade; the book has no independent side clock.; FVSZ26 · intraday · December bid observed near 05:10 Toronto. The 05:09:54 timestamp is the latest nearby trade; the book has no independent side clock.

Decision review

Version 1

Evidence: Nov 16, 2026, 5:17 a.m. Toronto · Record added: Nov 16, 2026, 5:25 a.m. Toronto

Avoid November versus December European volatility

The 0.40-point midpoint premium becomes only 0.35 when crossed. Four same-contract comparisons narrowed by only 0.075 point on average. Even cheaper commission and spread assumptions leave a loss.

FVSX26 / FVSZ26 · proposed study, no position opened

Proposed target: net payoffNot estimated
Proposed stop: net payoff-$107.59
Proposed entry: end-date forecast payoff-$38.77
Payoffs, assumptions and sensitivities

Managed trade outcomes

Exit illustrationNet return on entry margin / P&LChange vs closing nowOriginal budget R
TargetN/A on entry margin · Not estimatedNot estimatedAn explicit exit price is needed for every contract leg.
Stop-2.83% on entry margin · -$107.59Not estimated-0.839R
Adverse gap-8.64% on entry margin · -$327.81Not estimated-2.556R

Managed-strategy expected payoff: not estimated. Target-first, stop-first and time-exit probabilities have not been estimated. Stops and targets use observed prices; actual gaps may differ from the illustration.

Current net open P&L: Not estimated. Closing at the recorded mark after exit costs: Not estimated. Initial risk budget: $128.24. Original entry margin: $3,795.29 (sourced initial). R uses the initial budget and does not reset when a position loses money.

Planned trade exit: Nov 16, 2026, 8:00 a.m. Toronto. FVSX26 last trade 2026-11-18; FVSZ26 last trade 2026-12-16. Net-from-entry results cover the shown size and exclude earlier closed slices. Exit calculations include adverse tick rounding and commissions. Future prices use the recorded currency conversions unless an explicit scenario conversion is supplied.

End-date price forecast

Forecast date: Nov 16, 2026, 8:00 a.m. Toronto. Assumptions dated: Nov 16, 2026, 5:17 a.m. Toronto. September 21: 25%; September 22: 25%; September 23: 25%; November 12: 25%. Compare four positive-volume sessions with the 05:00 Toronto December-minus-November premium between 0.20 and 0.65 inclusive. Apply each leg’s observed 05:00–08:00 move to the current 17.675/18.075 midpoint pair. Entry assumes crossing the displayed sides, and the shared calculation also charges its standard costs. Current book is from 05:10, an imperfect proxy for the historical start.

End-date scenarioWeightReference pricesNet return on entry margin / P&LForward net P&L
September 2125%FVSX26 17.675; FVSZ26 18.075-1.24% on entry margin · -$47.03Not estimated
September 2225%FVSX26 17.725; FVSZ26 18.075-1.09% on entry margin · -$41.53Not estimated
September 2325%FVSX26 17.675; FVSZ26 18.025-1.09% on entry margin · -$41.53Not estimated
November 1225%FVSX26 17.825; FVSZ26 18.025-0.66% on entry margin · -$25.01Not estimated

Weighted result from entry: -1.02% on entry margin · -$38.77. Forward from the mark: Not estimated. Holding versus closing now: Not estimated.

These end-date scenarios assume holding without an earlier exit. Their weights are analyst judgments; they are not probabilities of reaching the target or stop first.

Sensitivity to the end-date modelProposed-entry net P&L
Move 5 percentage points from best to worst payoff-$39.88
Move 10 percentage points from best to worst payoff-$40.98
Double future exit friction-$62.29

Shared calculation: $23.52 future exit friction.

Next decision

Can the near expiry generate enough convergence before 08:00 Toronto?

Evidence to watch

The calendar’s ordinary morning convergence fails the cost test. A sharp equity selloff could reverse the result, but no entry is justified.

If the evidence changes

Study exits November 16 at 08:00 Toronto, before November 18 final settlement. No roll.

Evidence and price reasoning

Market expectation

The midpoint curve stands in 0.40 point of contango. December includes additional event protection beyond Wednesday’s November expiry.

ATG’s differing view

Front volatility can outperform if risks concentrate in the immediate session.

Supporting evidence

The 0.40-point midpoint premium becomes only 0.35 when crossed. Four same-contract comparisons narrowed by only 0.075 point on average. Even cheaper commission and spread assumptions leave a loss.

Strongest counterargument

The near contract can decay faster and the edge in four comparisons fails realistic costs.

Price assumptions

Pair actual November and December futures changes and keep separate dates for an expiry-week control. €100/point for each leg.

Portfolio contribution

A long front calendar can benefit from sudden European risk aversion, with residual term-structure risk and large gross margin.

Economic research horizon: 2027-03-15. Forecast scoring date: Nov 16, 2026, 8:00 a.m. Toronto. A trade exit does not end the forecast evaluation.

Entry conditions

Research only. No order.

Target framework

Unspecified

Fundamental invalidation

The calendar’s ordinary morning convergence fails the cost test. A sharp equity selloff could reverse the result, but no entry is justified.

Stop and risk limitation

Research stress only. No active order.

Strongest counterargument

The near contract can decay faster and the edge in four comparisons fails realistic costs.

Next catalyst

The calendar’s ordinary morning convergence fails the cost test. A sharp equity selloff could reverse the result, but no entry is justified.

Roll and delivery

Study exits November 16 at 08:00 Toronto, before November 18 final settlement. No roll.

Market evidence

One full package with stated contract multipliers and costs.

Expected return: interpretation

Gross published long and short overnight margins €3,446.898. No offset; convert at 05:17 Toronto spot EUR/USD midpoint 1.101075.

Source references

How the view evolved

  1. Avoid November versus December European volatility — The 0.40-point midpoint premium becomes only 0.35 when crossed. Four same-contract comparisons narrowed by only 0.075 point on average. Even cheaper commission and spread assumptions leave a loss.
Read the market context
ATG / GLOBAL MARKETS

Follow the evidence.

New research, useful explanations, and the decisions that follow.

Follow on Instagram Subscribe by RSS